Infrastructure repairs
Below is a list of requests to Fife Council concerning on-going necesary infrastucture repairs/maintenance. If anyone has anything to add please let us know.
Infrastructure items in Elie and Earlsferry pending
Infrastructure items in Elie and Earlsferry pending
First reported |
Description |
Progress reports |
Completed date |
October 2020 |
Bin-store at Ruby Bay requires be repainted or replaced. |
Plans to extend car park and re site recycle store |
|
October 2020 |
Regular flooding is occurring at the bottom of Cadger’s Wynd. |
On-going |
|
February 2024 |
Two holes in road opposite entrance to drive to Elie House |
Reported to Cllr Sean Dillon This is an ARP scheme due to start August ‘24 |
|
February 2024 |
The pavements on both sides of the road in the Toft require to be repaired |
Reported to Cllr Sean Dillon January ’25 Alycia reported on to do list summer 2025 |
|
February 2024 |
There is a hole in Harbour Road opposite the toilet. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The signs at the bottom of Admiralty Lane are rusted and require to be removed and replaced if required. |
Reported to Cllr Sean Dillon area not adopted and is Community services land. Alycia to pass on to Grounds Maintenance 03/07/24 |
|
February 2024 |
There are a number of potholes on Chapel Green Road, which require to be filled in. |
Reported to Cllr Sean Dillon Alycia has passed on 03/07/24 |
|
February 2024 |
The sign at the corner of Earlsferry High St. and Links Road is leaning over at an angle. |
Reported to Cllr Sean Dillon Alycia passed on to Street Lighting for repair 03/07/24 |
|
February 2024 |
Give way sign at the top of Stenton Row at junction with High Street has disappeared. Sign should say – ‘Not suitable for campervans’. |
Reported to Cllr Sean Dillon To be added to list 03/07/24 Grizelda reported on line09/09/24 FC acknowledged 09/09/09/24 03/02/25 To be seen to |
|
February 2024 |
Short pavement that runs along the front of the play park needs repaired. It is very uneven and crumbling in places |
Reported to Cllr Sean Dillo To be added to list 03/07/24 |
|
February 2024 |
No entry sign needs to be placed on road at West end of Earlsferry High St. At bottom of Chapel Green Road at the corner of Earlsferry High St and Links Road there needs to be a sign pointing LEFT to main road. At bottom of back road into Earlsferry, there needs to be a No Right Turn sign at Links Road. |
Reported to Cllr Sean Dillon All traffic Management issues Alycia 03/07/24 |
|
February 2024 |
Several potholes on road to Elie Harbour |
Reported to Cllr Sean Dillon |
|
March 2024 |
Pavement on east side of Park Place has disintegrated and needs resurfacing |
Reported to Cllr Sean Dillon |
|
March 2024 |
Request for signage both ways at bridge near entry to Elie Caravan Park and possible priority one way sign. |
Reported to Cllr Sean Dillon Is being addressed by Traffic Management following meeting 12/06/24 |
|
March 2024 |
Request for street lighting on The Vennel and Fountain Road. Previously, when lights were brighter existing lighting was sufficient – not any more. |
Reported to Cllr Sean Dillon |
|
August 2024 |
Broken glass pane at bis stop by entrance to Elie House opposite Baird place |
Angela reported to Councillors Grizelda has reported to FC on line 30/08/24 |
First broken pane replaced Oct ’24 but still a cracked one |
August 2024 |
Numerous potholes on road to Shell Bay |
|
|
August 2024 |
Repainting of double yellow lines required at: Park Place; Elie High St and the road between Toll Green and Toll Green Hall; Earlsferry High Street, road up to Chapel Green and turning circle at Chapel Green, Links Road, bottom of Ferry Road, Links Place, road to Ruby Bay car park; Williamsburgh and Telford Wynd. |
|
|
September 2024 |
Sign on Fountain Road facing wall |
Grizelda to check exactly before reporting to FC |
|
Sep 2024 |
Missing yellow lines on roundabout High Street/Park Place |
Carol reported to FC who have agreed to ‘look into it’. |
|
Oct 24 |
Sewage running down Club House Lane |
Reported to SW – have been told that work will commence 3rd December |
|
JAN 2025 |
Improve lighting Fountain Road and South Street
|
|
|
Jan 2025 |
Incoming traffic in middle of road sign A917 north of entrance to caravan park down |
Reported to FC – acknowledged Jan ‘25 |
|
Jan 2025 |
Still waiting for ‘Your Speed’ sign at entrance to village promised by Nigel at transportation meeting June 2024 |
|
|
|
|
|
|
|
|
|
|